[1] 甘茂治,康建设,高崎.军用装备维修工程学[M].北京:国防工业出版社,1999. [2] 杨宇航,冯允成.资源维修效能优化仿真研究[J].系统仿真学报,2001,13(4):420-422. [3] Chung Shu-Hsing,Kang He Yau,Pearu W L.A service level model for the control wafers safety inventory problem[J].The International Journal of Advanced Manufacturing Technology,2005,26(5) ;591-597. [4] Axsater S.Scaling down muhi-echelon inventory problems[J].Int J Production Economics,2001(71):255-261. [5] IMRED.Optimal production inventory strategies for a HMMS type reverse logistics systen[J].International Journal of Production Economics,2003,81:351-360. [6] 尤建新,隋明刚,杜娟.闭环供应链中可修理库存优化模型与算法[J].同济大学学报(自然科学版),2004,32(11):1534-1538. [7] Hausman W H,Scudder G D.Priority scheduling rules for repairable inventory systems[J].Management Science,1982,28:1251-1232. [8] 范浩,贾希胜,贾云献,等.基于遗传算法的备件两级优化建模与仿真研究[J].系统工程与电子技术,2006,28(1):150-152.(Fan Hao,Jia Xisheng,Jia Yunxian,et al.Modeling and simulation of two levels spare parts optimization based on GA[J].Systems Engineering and Electronics,2006,28(1):150-152.) [9] Towill D R.Supply chain dynamics[J].International Journal of Computer Integrated Manufacturing,1991,4(4):197-208. [10] Wikner J,Towill D R,Naim M M.Smoothing supply chain dynamics[J].International Journal of Production Economics,1991,22(3):231-248. [11] 杨宇航,赵建民.备件管理系统仿真研究[J].系统仿真学报,2004,16(5)1981-986. [12] Kdton W D,Sedowski R P,Sedowski D A.Simulation with arena[M].2nd edition.Highstown,NJ,USA:McGraw Hill,2002. [13] Raza S A,Akgunduz A,Chen M Y.A tabu search algorithm for solving economic lot scheduling problem[J].Journal of Heuristics,2006,12(6):413-425. [14] Konstantinos G Z,Konstantinos N A.A heuristic algorithm for solving hazardous materials distribution probiems[J].European Journal of Operational Research,2004,152:507-519. [15] Ji M J,Tang H W.Global optimizarion and tabu search based on memory[J].Applied Mathematics and Computation,2004,159(2):449-457. |