Systems Engineering and Electronics ›› 2023, Vol. 45 ›› Issue (9): 2802-2811.doi: 10.12305/j.issn.1001-506X.2023.09.19
• Systems Engineering • Previous Articles Next Articles
Honghai ZHANG, Zhenping REN, Ouge FENG, Fei WANG, Hao LIU
Received:
2022-04-20
Online:
2023-08-30
Published:
2023-09-05
Contact:
Honghai ZHANG
CLC Number:
Honghai ZHANG, Zhenping REN, Ouge FENG, Fei WANG, Hao LIU. Logistics unmanned aerial vehicle flight plan pre-allocation in urban low-altitude airspace[J]. Systems Engineering and Electronics, 2023, 45(9): 2802-2811.
Table 1
Parameter setting"
参数 | 取值 |
飞行速度v/(m·s-1) | 8 |
单位运输成本Cd/(元·kg-1·km-1) | 0.24 |
单位延误成本Cp/(元·s-1) | 0.17 |
最长等待时间Tm/s | 120 |
无人机最远航程dmax/m | 2 865 |
无人机最大载重qmax/kg | 6 |
最长飞行时间Tflymax/min | 16 |
最小起飞时间间隔ΔTdep/s | 10 |
最小到达时间间隔ΔTarr/s | 10 |
最小交叉点时间间隔ΔTsafe/s | 10 |
R1航路距离/m | 1 008.53 |
R2航路距离/m | 1 104.94 |
R3航路距离/m | 885.84 |
R4航路距离/m | 1 258.99 |
R5航路距离/m | 872.99 |
R6航路距离/m | 1 392.31 |
Table 2
Schedules of R1"
序号 | 起飞时间 | 送达时间 | 返程时间 | 交叉时间 | 返回时间 |
1 | 08:00:00 | 08:01:07 | 08:01:16 | 08:01:45 | 08:02:15 |
2 | 08:00:40 | 08:01:47 | 08:01:56 | 08:02:25 | 08:02:55 |
3 | 08:01:20 | 08:02:27 | 08:02:36 | 08:03:05 | 08:03:35 |
4 | 08:02:00 | 08:03:07 | 08:03:16 | 08:03:45 | 08:04:15 |
5 | 08:02:40 | 08:03:47 | 08:03:56 | 08:04:25 | 08:04:55 |
6 | 08:03:20 | 08:04:27 | 08:04:36 | 08:05:05 | 08:05:35 |
⋮ | ⋮ | ⋮ | ⋮ | ⋮ | ⋮ |
169 | 09:53:00 | 09:54:07 | 09:54:16 | 09:54:45 | 09:55:15 |
170 | 09:53:40 | 09:54:47 | 09:54:56 | 09:55:25 | 09:55:55 |
171 | 09:54:20 | 09:55:27 | 09:55:36 | 09:56:05 | 09:56:35 |
172 | 09:55:00 | 09:56:07 | 09:56:16 | 09:56:45 | 09:57:15 |
173 | 09:55:40 | 09:56:47 | 09:56:56 | 09:57:25 | 09:57:55 |
174 | 09:56:20 | 09:57:27 | 09:57:36 | 09:58:05 | 09:58:35 |
175 | 09:57:00 | 09:58:07 | 09:58:16 | 09:58:45 | 09:59:15 |
Table 3
Schedules of R2"
序号 | 起飞时间 | 送达时间 | 返程时间 | 交叉时间 | 返回时间 | |
1 | 08:00:10 | 08:01:28 | 08:01:35 | 08:02:05 | 08:02:35 | |
2 | 08:00:50 | 08:02:08 | 08:02:15 | 08:02:45 | 08:03:15 | |
3 | 08:01:30 | 08:02:48 | 08:02:55 | 08:03:25 | 08:03:55 | |
4 | 08:02:10 | 08:03:28 | 08:03:35 | 08:04:05 | 08:04:35 | |
5 | 08:02:50 | 08:04:08 | 08:04:15 | 08:04:45 | 08:05:15 | |
6 | 08:03:30 | 08:04:48 | 08:04:55 | 08:05:25 | 08:05:55 | |
⋮ | ⋮ | ⋮ | ⋮ | ⋮ | ⋮ | |
169 | 09:53:10 | 09:54:28 | 09:54:35 | 09:55:05 | 09:55:35 | |
170 | 09:53:50 | 09:55:08 | 09:55:15 | 09:55:45 | 09:56:15 | |
171 | 09:54:30 | 09:55:48 | 09:55:55 | 09:56:25 | 09:56:55 | |
172 | 09:55:10 | 09:56:28 | 09:56:35 | 09:57:05 | 09:57:35 | |
173 | 09:55:50 | 09:57:08 | 09:57:15 | 09:57:45 | 09:58:15 | |
174 | 09:56:30 | 09:57:48 | 09:57:55 | 09:58:25 | 09:58:55 |
Table 4
Schedules of R5"
序号 | 起飞时间 | 送达时间 | 返程时间 | 返回时间 |
1 | 08:00:20 | 08:01:09 | 08:01:25 | 08:02:25 |
2 | 08:01:00 | 08:01:49 | 08:02:05 | 08:03:05 |
3 | 08:01:40 | 08:02:29 | 08:02:45 | 08:03:45 |
4 | 08:02:20 | 08:03:09 | 08:03:25 | 08:04:25 |
5 | 08:03:00 | 08:03:49 | 08:04:05 | 08:05:05 |
6 | 08:03:40 | 08:04:29 | 08:04:45 | 08:05:45 |
⋮ | ⋮ | ⋮ | ⋮ | ⋮ |
171 | 09:54:00 | 09:54:49 | 09:55:05 | 09:56:05 |
172 | 09:54:40 | 09:55:29 | 09:55:45 | 09:56:45 |
173 | 09:55:20 | 09:56:09 | 09:56:25 | 09:57:25 |
174 | 09:56:00 | 09:56:49 | 09:57:05 | 09:58:05 |
175 | 09:56:40 | 09:57:29 | 09:57:45 | 09:58:45 |
Table 5
Schedules of R6"
序号 | 起飞时间 | 送达时间 | 返程时间 | 返回时间 |
1 | 08:00:30 | 08:01:52 | 08:02:33 | 08:04:05 |
2 | 08:01:10 | 08:02:32 | 08:03:13 | 08:04:45 |
3 | 08:01:50 | 08:03:12 | 08:03:53 | 08:05:25 |
4 | 08:02:30 | 08:03:52 | 08:04:33 | 08:06:05 |
5 | 08:03:10 | 08:04:32 | 08:05:13 | 08:06:45 |
6 | 08:03:50 | 08:05:12 | 08:05:53 | 08:07:25 |
⋮ | ⋮ | ⋮ | ⋮ | ⋮ |
170 | 09:53:30 | 09:54:52 | 09:55:33 | 09:57:05 |
171 | 09:54:10 | 09:55:32 | 09:56:13 | 09:57:45 |
172 | 09:54:50 | 09:56:12 | 09:56:53 | 09:58:25 |
173 | 09:55:30 | 09:56:52 | 09:57:33 | 09:59:05 |
174 | 09:56:10 | 09:57:32 | 09:58:13 | 09:59:45 |
Table 6
Result of flight plan based on comprehensive priority allocation"
计划 | 公司 | 货物类型 | 货物重量/kg | 期望送达时间 | 航路 | 起飞顺序 | 起飞时间 | 送达时间 | 返回时间 |
P1 | A | 数码产品 | 0.19 | 08:00-08:03 | R1 | 1 | 08:00:00 | 08:01:07 | 08:02:15 |
P2 | B | 普通用品 | 0.92 | 08:00-08:05 | R1 | 3 | 08:01:20 | 08:02:27 | 08:03:35 |
P3 | B | 普通用品 | 0.43 | 08:00-08:07 | R1 | 5 | 08:02:40 | 08:03:47 | 08:04:55 |
P4 | C | 普通用品 | 3.03 | 08:00-08:05 | R1 | 2 | 08:00:40 | 08:01:47 | 08:02:55 |
P5 | D | 普通用品 | 1.69 | 08:00-08:07 | R1 | 4 | 08:02:00 | 08:03:07 | 08:04:15 |
P6 | A | 文件 | 0.89 | 08:00-08:03 | R2 | 1 | 08:00:10 | 08:01:28 | 08:02:35 |
P7 | A | 普通用品 | 2.66 | 08:00-08:05 | R2 | 4 | 08:02:10 | 08:03:28 | 08:04:35 |
P8 | B | 食品生鲜 | 1.38 | 08:00-08:03 | R2 | 2 | 08:00:50 | 08:02:08 | 08:03:15 |
P9 | C | 普通用品 | 1.63 | 08:00-08:03 | R2 | 3 | 08:01:30 | 08:02:48 | 08:03:55 |
P10 | C | 其他 | 0.57 | 08:00-08:07 | R2 | 5 | 08:02:50 | 08:04:08 | 08:05:15 |
P11 | C | 数码产品 | 1.18 | 08:00-08:03 | R5 | 2 | 08:01:00 | 08:01:49 | 08:03:05 |
P12 | D | 普通用品 | 1.66 | 08:00-08:05 | R5 | 4 | 08:02:20 | 08:03:09 | 08:04:25 |
P13 | D | 其他 | 0.89 | 08:00-08:05 | R5 | 5 | 08:03:00 | 08:03:49 | 08:05:05 |
P14 | D | 文件 | 3.12 | 08:00-08:05 | R5 | 1 | 08:00:20 | 08:01:09 | 08:02:25 |
P15 | E | 数码产品 | 0.59 | 08:00-08:05 | R5 | 3 | 08:01:40 | 08:02:29 | 08:03:45 |
P16 | A | 食品生鲜 | 2.6 | 08:00-08:03 | R6 | 1 | 08:00:30 | 08:01:52 | 08:04:05 |
P17 | A | 普通用品 | 1.4 | 08:00-08:03 | R6 | 3 | 08:01:50 | 08:03:12 | 08:05:25 |
P18 | A | 普通用品 | 0.86 | 08:00-08:05 | R6 | 4 | 08:02:30 | 08:03:52 | 08:06:05 |
P19 | E | 其他 | 0.26 | 08:00-08:07 | R6 | 5 | 08:03:10 | 08:04:32 | 08:06:45 |
P20 | E | 普通用品 | 2.5 | 08:00-08:05 | R6 | 2 | 08:01:10 | 08:02:32 | 08:04:45 |
1 | CONSULTING P. The future of vertical mobility: sizing the market for passenger, inspection, and goods services until 2035[EB/OL]. [2022-04-15]. https://www.porsche consulting.com/fileadmin/docs/04_Medien/Pub likationen/TT1371_The_Future_ of_Vertical_Mobility/The_Future_of_Vertical_Mobility_A_Porsche_Consulting_study__C_2018.pdf. |
2 | STANLEY M. Urban air mobility flying cars: Investment implications of autonomous urban air mobility[EB/OL]. [2022-04-15]. https://www.morganstanley.com/ideas/autonomous-aircraft. |
3 | GOYAL R. Urban air mobility(UAM) market study[EB/OL]. [2022-04-15]. https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20190001472.pdf. |
4 | SWADESIR L, BIL C. Urban air transportation for Melbourne metropolitan area[C]//Proc. of the AIAA Aviation 2019 Forum, 2019. |
5 |
RABTAB,WANKMVLLERC,REINERG.A drone fleet model for last-mile distribution in disaster relief operations[J].International Journal of Disaster Risk Reduction,2018,28,107-112.
doi: 10.1016/j.ijdrr.2018.02.020 |
6 | SCOTT J, SCOTT C. Drone delivery models for healthcare[C]// Proc. of the Hawaii International Conference on System Sciences, 2017. |
7 | SONGB D,PARKK,KIMJ.Persistent UAV delivery logistics: MILP formulation and efficient heuristic[J].Computers & Industrial Engineering,2018,120,418-428. |
8 | CHEN A Z J, MO J P T. Modelling of unmanned aerial vehicle deliveries in populated urban areas for risk management[C]//Proc. of the International Conference on Software, Knowledge, Information Management & Applications, 2017: 61-66. |
9 | DUAN F L, LI X H, ZHAO Y. Express UAV swarm path planning with VND enhanced memetic algorithm[C]//Proc. of the International Conference on Computing and Data Engineering, 2018: 93-97. |
10 | JIANG X W, ZHOU Q, YE Y. Method of task assignment for UAV based on particle swarm optimization in logistics[C]//Proc. of the International Conference on Intelligent Systems, 2017: 113-117. |
11 |
ZHAOY Q,LIUK,LUG H,et al.Path planning of UAV delivery based on improved APF-RRT* algorithm[J].Journal of Physics Conference Series,2020,1624,042004.
doi: 10.1088/1742-6596/1624/4/042004 |
12 |
LINC E,SHAOP C.Failure analysis for an unmanned aerial vehicle using safe path planning[J].Journal of Aerospace Information Systems,2020,17(7):358-369.
doi: 10.2514/1.I010795 |
13 | 傅辰涛, 王宏伟. 飞行冲突探测与调配辅助决策过程研究[C]// 第一届空中交通管理系统技术学术年会论文集, 2018: 74-77. |
FU C T, WANG H W. Research on flight conflict detection and deployment assistant decision-making process[C]//Proc. of the Annual Conference on Air Traffic Management System Technology, 2018: 74-77. | |
14 | TAN Q Y, WANG Z K, ONG Y S, et al. Evolutionary optimization-based mission planning for UAS traffic management(UTM)[C]//Proc. of the International Conference on Unmanned Aircraft Systems, 2019: 952-958. |
15 | 田宇,张洪海,钱晓鹏,等.低空通航飞行计划预先调配方法研究[J].武汉理工大学学报(交通科学与工程版),2020,44(3):444-449. |
TIANY,ZHANGH H,QIANX P,et al.Research on pre-allocation method of low-altitude general aviation flight plan[J].Journal of Wuhan University of Technology (Transportation Science and Engineering Edition),2020,44(3):444-449. | |
16 |
高虎,褚映红,杨明,等.通用航空飞行计划处理系统的设计与实现[J].现代导航,2019,10(3):187-190.
doi: 10.3969/j.issn.1674-7976.2019.03.007 |
GAOH,CHUY H,YANGM,et al.Design and realization of general aviation flight plan system[J].Modern Navigation,2019,10(3):187-190.
doi: 10.3969/j.issn.1674-7976.2019.03.007 |
|
17 |
向征,丁钰童.基于飞行计划集中处理的预战术航路飞行流量预测[J].科学技术与工程,2021,21(24):10525-10530.
doi: 10.3969/j.issn.1671-1815.2021.24.058 |
XIANGZ,DINGY T.Flight flow prediction of pre-tactical routes based on centralized processing of flight plan[J].Science Technology and Engineering,2021,21(24):10525-10530.
doi: 10.3969/j.issn.1671-1815.2021.24.058 |
|
18 |
TAKEICHIN.Nominal flight time optimization for arrival time scheduling through estimation/resolution of delay accumulation[J].Transportation Research Part C: Emerging Techno-logies,2017,77,433-443.
doi: 10.1016/j.trc.2017.01.025 |
19 |
ZHANGY C,RONGS,LIQ,et al.Distributed flight routing and scheduling for air traffic flow management[J].IEEE Trans.on Intelligent Transportation Systems,2017,18(10):2681-2692.
doi: 10.1109/TITS.2017.2657550 |
20 |
LIANGZ,CHAOVALITWONGSEW A,ELSAYEDE A.Sequence assignment model for the flight conflict resolution problem[J].Transportation Science,2014,48(3):334-350.
doi: 10.1287/trsc.2013.0480 |
21 | BENLICU.Heuristic search for allocation of slots at network level[J].Transportation Research Part C: Emerging Technologies,2018,86(1):488-509. |
22 |
ZHONGH,GUANW,ZHANGW Y,et al.A bi-objective integer programming model for partly-restricted flight departure scheduling[J].PloS One,2018,13(5):e0196146.
doi: 10.1371/journal.pone.0196146 |
23 |
ANDROUTSOPOULOSK N,MANOUSAKISE G,MADASM A.Modeling and solving a bi-objective airport slot scheduling problem[J].European Journal of Operational Research,2020,284(1):135-151.
doi: 10.1016/j.ejor.2019.12.008 |
24 | JORGED,RIBEIRON A,ANTUNESA P.Towards a decision-support tool for airport slot allocation: application to Guarulhos (Sao Paulo, Brazil)[J].Journal of Air Transport Ma-nagement,2021,93(2):102048. |
25 | FAIRBROTHERJ,ZOGRAFOSK G.Optimal scheduling of slots with season segmentation[J].European Journal of Operational Research,2020,291(3):961-982. |
26 | ZOGRAFOSK G,JIANGY.A bi-objective efficiency-fairness model for scheduling slots at congested airports[J].Transportation Research Part C: Emerging Technologies,2019,102(5):336-350. |
27 |
FAIRBROTHERJ,ZOGRAFOSK G,GLAZEBROOKK D.A slot-scheduling mechanism at congested airports that incorporates efficiency, fairness, and airline preferences[J].Transportation Science,2020,54(1):115-138.
doi: 10.1287/trsc.2019.0926 |
28 | PELLEGRINIAP,BOLIĆBT,CASTELLIL,et al.SOSTA: an effective model for the simultaneous optimization of airport slot allocation[J].Transportation research Part E: Logistics and Transportation Review,2017,99C(5):34-53. |
29 | RIBEIRON A,JACQUILLATA,ANTUNESA P,et al.Improving slot allocation at level 3 airports[J].Transportation Research Part A: Policy and Practice,2019,127(9):32-54. |
30 | 国家邮政局. 国家邮政局关于2021年快递服务满意度调查和时限准时率测试结果的通告[EB/OL]. [2022-04-15]. http://www.spb.gov.cn/gjyzj/c100009/c100010/202201/0ce493fa7228415e9a1e6e81998c4bbb.shtml. |
State Post Bureau. Announcement of the state post bureau on the 2021 express service satisfaction survey and time-limi- ted on-time rate test results[EB/OL]. [2022-04-15]. http://www.spb.gov.cn/gjyzj/c100009/c100010/202201/0ce493fa7228415e9a1e6e81998c4bbb.shtml. | |
31 | 李翰,张洪海,张连东,等.城市区域多物流无人机协同任务分配[J].系统工程与电子技术,2021,43(12):3594-3602. |
LIH,ZHANGH H,ZHANGL D,et al.Multiple logistics unmanned aerial vehicle collaborative task allocation in urban areas[J].Systems Engineering and Electronics,2021,43(12):3594-3602. |
[1] | Zhiwei XING, Hong'en LIU, Biao LI, Qian LUO, Tao WEN, Zhaoxin CHEN. Modelling for airport gate operation process based on relational spatio-temporal network [J]. Systems Engineering and Electronics, 2021, 43(3): 722-730. |
[2] | Han LI, Honghai ZHANG, Liandong ZHANG, Hao LIU. Multiple logistics unmanned aerial vehicle collaborative task allocation in urban areas [J]. Systems Engineering and Electronics, 2021, 43(12): 3594-3602. |
[3] | Tao XU, Zhishuai WU, Min LU, Zonglei LYU, Zhonghu LI. Optimization model of hub-and-spoke network for congestion problem [J]. Systems Engineering and Electronics, 2020, 42(11): 2553-2559. |
[4] | XING Zhiwei, LI Biao, LUO Qian. Operational effectiveness evaluation of ground service for transit flight [J]. Systems Engineering and Electronics, 2019, 41(5): 1071-1078. |
[5] | LI Bo, ZHOU Jingyang, GAO Xiaoguang. Task schedule method of phased array radar based on auction algorithm [J]. Systems Engineering and Electronics, 2018, 40(8): 1736-1742. |
[6] | ZHANG Tian-ci, DING Meng, ZUO Hong-fu, WANG Bang-feng, ZENG Li-na, SUN Ze-jun. Zone control based aircraft ground movement trajectory optimization model [J]. Systems Engineering and Electronics, 2016, 38(1): 136-141. |
[7] | ZHU Xiao-hui, ZHANG Jun. Air traffic complexity evaluation method based on probabilistic trajectory prediction [J]. Systems Engineering and Electronics, 2014, 36(2): 300-305. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||