1 |
刘翱, 刘克. 舰载机保障作业调度问题研究进展[J]. 系统工程理论与实践, 2017, 37 (1): 49- 60.
|
|
LIU A , LIU K . Advances in carrier-based aircraft deck operation scheduling[J]. Systems Engineering-Theory & Practice, 2017, 37 (1): 49- 60.
|
2 |
U.S. Naval Air Systems Command. CVN flight-hanger deck NATOPS manual[R]. Washington: NACYAIR 00-80T-120, 2008-10-04.
|
3 |
WANG X W , LIU J , SU X C , et al. A review on carrier aircraft dispatch path planning and control on deck[J]. Chinese Journal of Aeronautics, 2020, 33 (12): 3039- 3057.
doi: 10.1016/j.cja.2020.06.020
|
4 |
RYAN J C , BANERJEE A G , CUMMINGS M L , et al. Comparing the performance of expert user heuristics and an integer linear program in aircraft carrier deck operations[J]. IEEE Trans.on Cybernetics, 2014, 44 (6): 761- 773.
doi: 10.1109/TCYB.2013.2271694
|
5 |
韩维, 苏析超, 陈俊锋. 舰载机多机一体化机务保障调度方法[J]. 系统工程与电子技术, 2015, 37 (4): 809- 816.
|
|
HAN W , SU X C , CHEN J F . Integrated maintenance support scheduling method of multi-carrier aircraft[J]. Systems Engineering and Electronics, 2015, 37 (4): 809- 816.
|
6 |
苏析超, 韩维, 张勇, 等. 考虑人机匹配模式的舰载机甲板机务勤务保障调度算法[J]. 航空学报, 2018, 39 (12): 221- 239.
|
|
SU X C , HAN W , ZHANG Y , et al. Scheduling algorithm for maintenance and service support of carrier-based aircraft on flight deck with different man-aircraft matching patterns[J]. Acta Aeronautica et Astronautica Sinica, 2018, 39 (12): 221- 239.
|
7 |
SU X C , HAN W , WU Y , et al. A proactive robust scheduling method for aircraft carrier flight deck operations with stochastic durations[J]. Complexity, 2018, 1, 1- 38.
|
8 |
SU X C , HAN W , WU Y , et al. A robust scheduling optimization method for flight deck operations of aircraft carrier with ter nary interval durations[J]. IEEE Access, 2018, 6, 69918- 69936.
doi: 10.1109/ACCESS.2018.2879503
|
9 |
YUAN P L , HAN W , SU X C , et al. A dynamic scheduling method for carrier aircraft support operation under uncertain con ditions based on rolling horizon strategy[J]. Applied S ciences, 2018, 8 (9): 1546- 1568.
|
10 |
YU L F , ZHU C , SHI J M , et al. An extended flexible job shop scheduling model for flight deck scheduling with priority, parallel operations, and sequence flexibility[J]. Scientific Programming, 2017, 2017, 2463252.
|
11 |
李耀宇, 朱一凡, 杨峰, 等. 基于逆向强化学习的舰载机甲板调度优化方案生成方法[J]. 国防科技大学学报, 2013, 35 (4): 171- 175.
|
|
LI Y Y , ZHU Y F , YANG F , et al. Inverse reinforcement learning based optimal schedule generation approach for carrier aircraft on flight deck[J]. Journal of National University of Defense Technology, 2013, 35 (4): 171- 175.
|
12 |
QI C , WANG D . Dynamic aircraft carrier flight deck task planning based on HTN[J]. IFAC-Papers on Line, 2016, 49 (12): 1608- 1613.
doi: 10.1016/j.ifacol.2016.07.810
|
13 |
COELLO C A C . Evolutionary multi-objective optimization: a historical view of the field[J]. IEEE Computational Intelligence Magazine, 2006, 1 (1): 28- 36.
doi: 10.1109/MCI.2006.1597059
|
14 |
DEB K , PRATAP A , AGARWAL S , et al. A fast and elitist multiobjective genetic algorithm: NSGA-Ⅱ[J]. IEEE Trans.on Evolutionary Computation, 2002, 6 (2): 191- 197.
|
15 |
SRINIVAS N , DEB K . Multi-objective optimization using nondominated sorting in genetic algorithms[J]. Evolutionary Computation, 1995, 2 (3): 221- 248.
|
16 |
刘继新, 江灏, 董欣放, 等. 基于空中交通密度的进场航班动态协同排序方法[J]. 航空学报, 2020, 41 (7): 279- 294.
|
|
LIU J X , JIANG H , DONG X F , et al. Dynamic collaborative sequencing method for arrival flights based on air traffic density[J]. Acta Aeronautica et Astronautica Sinica, 2020, 41 (7): 279- 294.
|
17 |
TALEBITOOTI R , GOHARI H D , ZARASTVAND M R . Multi objective optimization of sound transmission across laminated composite cylindrical shell lined with porous core investigating non-dominated sorting genetic algorithm[J]. Aerospace Science and Technology, 2017, 69, 269- 280.
doi: 10.1016/j.ast.2017.06.008
|
18 |
PU M J , WANG J H , ZHANG D X , et al. Optimal small satellite orbit design based on robust multi-objective optimization method[J]. Aerospace Science and Technology, 2017, 70, 339- 350.
doi: 10.1016/j.ast.2017.08.016
|
19 |
YEH C T . An improved NSGA2 to solve a bi-objective optimization problem of multi-state electronic transacti on network[J]. Reliability Engineering and System Safety, 2019, 191, 106578.
doi: 10.1016/j.ress.2019.106578
|
20 |
WEN X Y , WANG K H , LI H , et al. A two-stage solution method based on NSGA-Ⅱ for green multi-objective integrated process planning and scheduling in a battery packaging machinery workshop[J]. Swarm and Evolutionary Computation, 2021, 61, 100820.
doi: 10.1016/j.swevo.2020.100820
|
21 |
KASHYAP N , KUMARI A C , CHHIKARA R . Multi-objective Optimization using NSGA Ⅱ for service composition in IoT[J]. Pro cedia Computer Science, 2020, 167, 1928- 1933.
doi: 10.1016/j.procs.2020.03.214
|
22 |
CAO Y , DHAHAD H A , MUSTAFA MOHAMED A , et al. Thermo-economic investigation and multi-objective optimization of a novel enhanced heat pump system with zeotropic mixture using NSGA-Ⅱ[J]. Applied Thermal Engineering, 2020, 194, 116374.
|
23 |
KOLISCH R , HARTMANN S . Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis[M]. Boston: Springer US, 1999.
|
24 |
DEBELS D , DE REYCK B , LEUS R , et al. A hybrid scatter search/electromagnetism meta-heuristic for project scheduling[J]. European Journal of Operational Research, 2006, 169 (2): 638- 653.
doi: 10.1016/j.ejor.2004.08.020
|
25 |
SURESH M , DUTTA P , JAIN K . Resource constrained multi-project scheduling problem with resource transfer times[J]. Asia-Pacific Journal of Operational Research, 2015, 32 (6): 1550048- 1550077.
doi: 10.1142/S0217595915500487
|
26 |
KADRI R L , BOCTOR F F . An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case[J]. European Journal of Operational Research, 2018, 265 (2): 454- 462.
doi: 10.1016/j.ejor.2017.07.027
|
27 |
RAHMAN H F , CHAKRABORTTY R K , RYAN M J . Memetic algorithm for solving resource constrained project scheduling problems[J]. Automation in Construction, 2020, 111, 103052.
doi: 10.1016/j.autcon.2019.103052
|
28 |
郭霖瀚, 康锐, 文佳. 以保障活动为中心的装备保障资源数量预测[J]. 航空学报, 2009, 30 (5): 919- 924.
|
|
GUO L H , KANG R , WEN J . Quantitative forecast support activity centered equipment support resources[J]. Acta Aeronautica et Astronautica Sinica, 2009, 30 (5): 919- 924.
|
29 |
KRVGER D , SCHOLL A . A heuristic solution framework for the resource constrained multi-project scheduling problem with sequence-dependent transfer times[J]. European Journal of Operational Research, 2009, 197 (2): 492- 508.
doi: 10.1016/j.ejor.2008.07.036
|
30 |
HARTMANN S , KOLISCH R . Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 2000, 127 (2): 394- 407.
|
31 |
KOLISCH R . Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation[J]. European Journal of Operational Research, 1996, 90 (2): 320- 333.
|