系统工程与电子技术 ›› 2023, Vol. 45 ›› Issue (8): 2295-2304.doi: 10.12305/j.issn.1001-506X.2023.08.01

• “组织战略管理与体系总体设计——庆祝国防科技大学办学70周年”专栏 • 上一篇    下一篇

基于“项目-能力”关联的战略规划项目体系贡献率评估方法

王涛, 李小波, 张杰, 何华, 王维平   

  1. 国防科技大学系统工程学院, 湖南 长沙 410073
  • 收稿日期:2023-05-16 出版日期:2023-07-25 发布日期:2023-08-03
  • 通讯作者: 李小波
  • 作者简介:王涛(1976—), 男, 副教授, 博士, 主要研究方向为战略规划评估、体系工程与体系仿真
    李小波(1983—), 男, 副教授, 博士, 主要研究方向为战略规划评估、体系工程与体系仿真
    张杰(1999—), 男, 博士研究生, 主要研究方向为体系工程与体系仿真、智能优化
    何华(1991—), 男, 高级工程师, 博士, 主要研究方向为系统仿真建模、战略管理
    王维平(1962—), 男, 教授, 博士, 主要研究方向为战略规划评估、体系工程与体系仿真
  • 基金资助:
    国家自然科学基金(72101263);国家社会科学基金(2022-SKJJ-B-104);国家社会科学基金(2021-SKJJ-C-107)

Evaluation method for the system-of-systems contribution ratio of strategic planning project based on "project-capability" association

Tao WANG, Xiaobo LI, Jie ZHANG, Hua HE, Weiping WANG   

  1. College of Systems Engineering, National University of Defense Technology, Changsha 410073, China
  • Received:2023-05-16 Online:2023-07-25 Published:2023-08-03
  • Contact: Xiaobo LI

摘要:

根据军事力量体系化建设与运用的战略规划评估要求, 亟需从作战体系能力要求角度开展战略规划项目的定量评估。本文将体系贡献率评估引入战略规划评估领域, 以战略规划项目对作战体系能力和战略目标的贡献为主线, 构建明确项目体系定位的“项目-能力”关联模型和刻画作战体系建设过程机理特征的能力生成周期模型, 提出战略规划项目体系贡献率评估方法。通过开展“马赛克”作战体系支撑项目贡献率评估算例研究, 初步例证了所提方法的可行性和有效性。所提出的建用一体的项目评估模式, 能够为战略规划评估提供基于能力生成机理的定量决策支持。

关键词: 战略规划项目, “项目-能力”关联模型, 项目体系贡献率, 体系能力生成周期模型

Abstract:

According to the strategic planning evaluation requirements for the system-of-systems(SoS) construction and application of military forces, it is urgent to conduct quantitative evaluation of strategic planning projects from the perspective of combat SoS capability requirements. This article introduces the evaluation of SoS contribution rate into the field of strategic planning evaluation, focusing on the contribution of strategic planning projects to the capabilities and strategic objectives of the combat SoS. It constructs a "project-capability" correlation model with clear project SoS positioning and a capability generation cycle model that characterizes the mechanism characteristics of the combat SoS construction process. A method for evaluating the contribution rate of strategic planning project SoS is proposed. The feasibility and effectiveness of the proposed method are preliminarily demonstrated by conducting a case study on the contribution rate evaluation of the "mosaic" combat SoS support project. The proposed integrated project evaluation model can provide quantitative decision support for strategic planning evaluation based on capability generation mechanism.

Key words: strategic planning project, "project-capability" association model, project system-of-systems contribution ratio, system-of-systems capability generation cycle model

中图分类号: