Systems Engineering and Electronics ›› 2019, Vol. 41 ›› Issue (5): 1079-1086.doi: 10.3969/j.issn.1001-506X.2019.05.21
Previous Articles Next Articles
SONG Cunli
Online:
Published:
Abstract:
Key words: hybrid flow-shop scheduling problem, greedy genetic algorithm, forward and reverse decoding, makespan
SONG Cunli. Improved greedy genetic algorithm for solving the hybrid flow-shop scheduling problem[J]. Systems Engineering and Electronics, 2019, 41(5): 1079-1086.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://www.sys-ele.com/EN/10.3969/j.issn.1001-506X.2019.05.21
https://www.sys-ele.com/EN/Y2019/V41/I5/1079