Journal of Systems Engineering and Electronics ›› 2012, Vol. 34 ›› Issue (11): 2275-2279.doi: 10.3969/j.issn.1001-506X.2012.11.15

Previous Articles     Next Articles

Study on the CSP model of satellite TT&C resource scheduling

LING Xiao-dong1, WU Xiao-yue2, LIU Bing1, XUE Guo-hu1, WU Jin-mei1   

  1. 1. China Satellite Maritime Tracking and Control Department, Jiangyin 214431, China;
    2. College of Information System and Management, National University of Defense Technology, Changsha 410073, China
  • Online:2012-11-20 Published:2010-01-03

Abstract:

The modeling technology of multi-satellite TT&C scheduling problem(MuSTSP) is researched and the characteristic of MuSTSP is analyzed. First of all, the formal models for scenario, requirement and task are given. Then the constraints of the MuSTSP are studied and the objective is given allowing for different TT&C requirements of the satellite. Finally, the constraint satisfied problem (CSP) model of MuSTSP is build.The solution method is also mentioned summarily.

[an error occurred while processing this directive]