Journal of Systems Engineering and Electronics ›› 2012, Vol. 34 ›› Issue (12): 2485-2491.doi: 10.3969/j.issn.1001-506X.2012.12.14
Previous Articles Next Articles
FAN Hui-tao, ZHANG Tong-he
Online:
Published:
Abstract:
he characteristics and rules in project development which are called basic rules to be followed in project development are summarized. These rules include three aspects: performance related rules, quality related rules and behaviorrelated rules which can be summarized into twelve criteria. The general rules on advancedness, successiveness, adaptability, productivity, economy, safeness, reliability, testability, standardization, reality, sufficiency and riskiness are presented in project development.
CLC Number:
V 37
FAN Hui-tao, ZHANG Tong-he. Twelve rules in project development[J]. Journal of Systems Engineering and Electronics, 2012, 34(12): 2485-2491.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://www.sys-ele.com/EN/10.3969/j.issn.1001-506X.2012.12.14
https://www.sys-ele.com/EN/Y2012/V34/I12/2485