[1] Thomas L C.A survey of maintenance and replacement models for maintainability and reliability of multi-item systems[J].Reliability Engineering,1986,16:297-309. [2] 金玉兰,蒋祖华,侯文瑞.以可靠性为中心的多部件设备预防性维修策略的优化[J].上海交通大学学报,2006,40(12):2051-2056. [3] Zequeira R I,B,erenguer C Maintenance cost analyms of a two-component parallel system with failure interaction[J].Reliability,Availability,Maintainability,and sa fay,2004,2:220-225. [4] Murthy D N P,Nguyen D G.Study of two-component systems with failure interactions[J].Naval Research Logistics Quarterly,1985,32:239-247. [5] Barros A,Be'renguer C,Grail A.On the hazard rate process for imperfectly monitored multi-unit systems[J].Reliability Engineering and System Safety,2004,6:1-8. [6] Zequeira R I,B'erenguer C.On the inspection policy of a two-component parallel system with failure interaction[J].Reliability,Reliability Engineering and System Safety,2005,88:99-107. [7] Grail A,Bérenguer C,Dieulle L.A condition based maintenance policy for stochastically deteriorating system[J].Reliability Engineering and System Safety,2002,76:167-180. [8] 上海航空公司.上海航空公司可靠性月报,2005. [9] 顾嘉麟,郭建英.截尾数据下威布尔分布的参数估计问题[J].哈尔滨理工大学学报,2005,10(2):61-64. [10] Song Lingyan,Wu Dongfang,Dan Yong.Optimal probability estimators for determining Weibull parameters[J].Journal of Materials Science Letters,2003,22(23):1651-1653. |