Journal of Systems Engineering and Electronics ›› 2010, Vol. 32 ›› Issue (12): 2576-2583.doi: 10.3969/j.issn.1001-506X.2010.12.18

Previous Articles     Next Articles

Task-platform relation design model and algorithm for C2 organization structure under uncertainty

MU Liang, ZHANG Wei-ming, CHEN Tao, XIU Bao-xin   

  1. Science and Technology on Information System Engineering Laboratory, National Univ. 
    of Defense Technology, Changsha 410073, China
  • Online:2010-12-18 Published:2010-01-03

Abstract:

In view of the weaknesses of neglecting battlefield environment uncertainty of command and control (C2) organization in classical “task-platform” relation design (TPRD), a C2 organization structure “task-platform” relation design under uncertainty (TPRDU) is investigated to improve the practicality. TPRDU considers mission success uncertainty, mission time uncertainty and platform capability consumption uncertainty. 〖JP2〗A chance-constrained programming model with mission success probability (MSP) maximization objective for TPRDU is built and a scatter search (SS) algorithm to solve this model is designed. The SS algorithm uses the strategy of platform redundancy design (PRD) during generating the new solution. Finally, experimental results illustrate the practicality of TPRDU and the efficiency of SS, and validate that MSP can be improved through PRD strategy.

[an error occurred while processing this directive]